About the BAT Bureau

International Green Technologies and Investment Projects Center NJSC is a subordinate organization of the authorized body in the field of environmental protection, performing the functions of the Bureau of Best Available Techniques. It ensures the development of reference documents on best available techniques in accordance with the list and schedule for developing draft reference documents on best available techniques approved by the authorized body in the field of environmental protection under paragraph 6 of Article 418 of the Environmental Code of the Republic of Kazakhstan.

What is BAT?

Best Available Techniques (BAT) are used and planned sectoral technologies, techniques and equipment that provide organizational and management measures aimed at reducing the negative environmental impact of economic activities to the level of the target environmental quality indicators.

Legislative requirements

Under the Environmental Code of the RK, from 1 January 2025 Category I facilities are required to obtain integrated environmental permits (IEP) based on the application of BAT and on compliance of the facilities with the emission levels specified in BAT reference documents.

Economic incentives

When implementing BAT, industry is exempted from environmental tax payments on emissions, while for enterprises that do not switch to IEP, environmental payments will be gradually increased by 2, 4 and 8 times.

When implementing BAT

Exemption from environmental tax payments on emissions

Without switching to IEP

Environmental payments increase by 2, 4 and 8 times

In this regard, the Center is developing BAT reference documents.

What does the BAT Bureau do?

To support the transition of industry to BAT principles, the BAT Bureau provides:

  • Development of BAT reference documents in accordance with the list and schedule
  • Comprehensive technological audit (CTA)
  • Analysis, monitoring and methodological support on BAT and IEP

Structure of the BAT Bureau

The BAT Bureau has three structural divisions, each with its own functional tasks:

01

Expert Assessment Department

Comprehensive technological audit (CTA) and expert analysis of industrial enterprises

02

BAT Reference Documents Department

Development, updating and support of reference documents on best available techniques

03

Monitoring, Analytics and IEP Department

Monitoring, analytics and advisory support on integrated environmental permits (IEP)

Best Available Techniques (BAT) Bureau

Expert Assessment Department

Comprehensive technological audit of industrial enterprises and expert assessment of technological solutions

The Expert Assessment Department analyzes industrial enterprises by conducting a comprehensive technological audit.

General information on CTA

A comprehensive technological audit (CTA) is the first stage in developing and (or) revising reference documents on best available techniques (BAT).

The purpose of a CTA is to assess the current state of enterprises for compliance with the principles of best available techniques, to identify the technologies, means, methods, processes, practices, approaches and solutions introduced to prevent and (or) minimize negative anthropogenic impact on the environment, and to identify the enterprise’s potential for possible introduction of BAT.

Stages of a CTA

1

Data collection

Review of the materials provided and a site visit

2

Analysis

Comprehensive analysis of technological, environmental, energy and economic indicators

3

Comparison with BAT

Comparison with national and international BAT reference documents (OECD countries, EU, RF, etc.)

4

Results

Preparation of a CTA report with recommendations for improving production

Benefits of a CTA

  • Assessment

    Expert assessment of the existing technological processes and planned projects of production enterprises through a CTA

  • Planning

    Avoiding conflicting situations in setting technological indicators

  • Finance

    Preventing inefficient financing of ongoing construction and (or) reconstruction and modernization projects

  • Development

    Ensuring parallel development of environmental and industrial policies

Database for a CTA

The CTA is carried out by the BAT Bureau by visiting facilities and (or) collecting and analyzing the relevant information on them, including:

  1. technological processes and their indicators;
  2. environmental indicators and operational data (data on pollutant emissions, waste, consumption, etc.);
  3. economic indicators for process equipment (data on capital investment, revenue and expenditure, etc.);
  4. energy efficiency data.

Results of the work

140+

To date, more than 140 enterprises from various industries have received their CTA reports with a detailed description of technological processes, an assessment of the current state of the enterprise in terms of environmental and energy aspects, comparisons of technological indicators and introduced BAT with the reference documents of OECD countries and the Russian Federation, and recommendations for modernizing production.

Completed and ongoing CTA work:

2020

Industries coveredActivities covered
Cement industryproduction of cement, lime and magnesium oxide
Chemical industryproduction of inorganic acids and mineral fertilizers
production of basic inorganic chemicals (ammonia)
Energy industrygeneration of electricity and heat by fuel combustion
Non-ferrous metallurgymining and beneficiation of non-ferrous metal ores, production of non-ferrous metals
Precious metal miningmining and beneficiation of non-ferrous metal ores, production of non-ferrous metals
Ferrous metallurgymining and beneficiation of iron ores, production of cast iron, steel and ferroalloys, production of further processed ferrous metal products
Oil refining industryproduction of coke and petroleum products, natural gas processing
Oil production industryextraction of oil and natural gas

2021

Industries coveredActivities covered
Chemical industryproduction of solid and other inorganic chemicals (oxides, hydroxides, salts)
Energy industrygeneration of electricity and heat by fuel combustion
Non-ferrous metallurgymining and beneficiation of non-ferrous metal ores, production of non-ferrous metals
Ferrous metallurgymining and beneficiation of iron ores, production of cast iron, steel and ferroalloys, production of further processed ferrous metal products
Oil refining industryproduction of coke and petroleum products, natural gas processing
Oil production industryextraction of oil and natural gas

2022

Industries coveredActivities covered
Oil production industryextraction of oil and natural gas
Coal mining industrymining and beneficiation of coal and anthracite
Waste managementwaste disposal
Ferrous metallurgymining and beneficiation of iron ores, production of cast iron, steel and ferroalloys, production of further processed ferrous metal products
Chemical industryproduction of basic organic chemicals; production of polymers
Precious metal miningmining and beneficiation of non-ferrous metal ores, production of non-ferrous metals

2023

Industries coveredActivities covered
Wastewater treatmentwastewater treatment in centralized sewerage systems of populated areas
Oil production industryextraction of oil and natural gas
Titanium and magnesium productionmining and beneficiation of non-ferrous metal ores, production of non-ferrous metals
Oil refining industryproduction of coke and petroleum products, natural gas processing
Waste managementwaste disposal

2024

Industries coveredActivities covered
Chemical industryproduction of basic organic chemicals; production of polymers
Wastewater treatmentwastewater treatment in centralized sewerage systems of populated areas
Rare non-ferrous metal productionmining and beneficiation of non-ferrous metal ores, production of non-ferrous metals
Food industryproduction of food products, beverages, milk and dairy products
Asbestos mining and productionproduction of asbestos and manufacture of asbestos products
Waste managementwaste disposal
waste recovery
thermal destruction and utilization of waste

2025

Industries coveredActivities covered
Food industryproduction of food products, beverages, milk and dairy products
Agricultureintensive rearing of pigs and poultry
Wastewater treatmentwastewater treatment in centralized sewerage systems of populated areas
Uranium productionmining of uranium and thorium ores, beneficiation of uranium and thorium ores, production of nuclear fuel

2026

Industries coveredActivities covered
Food industryproduction of food products, beverages, milk and dairy products
Agricultureintensive rearing of pigs and poultry
Titanium and magnesium productionmining and beneficiation of non-ferrous metal ores, production of non-ferrous metals
Uranium productionmining of uranium and thorium ores, beneficiation of uranium and thorium ores, production of nuclear fuel
Chemical industryproduction of inorganic acids and mineral fertilizers
Precious metal miningmining and beneficiation of non-ferrous metal ores, production of non-ferrous metals

CTA plans

CTA plans for 2026–2028.

YearActivities planned to be covered
2026Production of milling products;
Slaughter of animals at meat-packing plants and refrigerated slaughterhouses;
Production of milk and dairy products.
2027Extraction and processing of common minerals
Production of road surfacing
Treatment of air emissions in the production of goods
2028Transportation of gas, gas processing products, oil and petroleum products via trunk pipelines
Production of building materials
Production of beverages, except low-alcohol and non-alcoholic beverages
Wastewater treatment in the production of goods

How to apply and contacts

To have a CTA carried out, please send an official request to the BAT Bureau using the contacts below:

Kairat Massenov

Managing Director – Head of the BAT Bureau

8 7172 573 221

k.massenov@igtipc.org

Saltanat Almurzayeva

Head of the Expert Assessment Department, BAT Bureau

8 7172 573 220

s.almurzayeva@igtipc.org

Aru Ismailova

Chief Manager, Expert Assessment Department, BAT Bureau

8 7172 573 263

a.jumasheva@igtipc.org

Klara Mochalova

Chief Manager, Expert Assessment Department, BAT Bureau

8 7172 573 254

k.mochalova@igtipc.org

Rymkesh Masheva

Chief Manager, Expert Assessment Department, BAT Bureau

8 7172 573 257

r.masheva@igtipc.org

Office Manager

BAT Bureau

8 7172 573 200

info@igtipc.org

Request a price quote for CTA

To receive a price quote for a Comprehensive Technological Audit, send an official request to info@igtipc.org

BAT Bureau, Office Manager: 8 7172 573 200

This request is preliminary. To carry out a CTA, an official request must be sent to the BAT Bureau.

Best Available Techniques (BAT) Bureau

BAT Reference Documents Department

Development, updating and support of reference documents on best available techniques

The BAT Reference Documents Department develops draft BAT reference documents and provides further advisory support in the authorized and interested state bodies until they are approved by resolutions of the Government of the Republic of Kazakhstan.

About the area

The BAT Reference Documents Department ensures the development of draft national sectoral and cross-sectoral reference documents on best available techniques, their updating and support until approval in the established manner.

What is a BAT reference document?

BAT reference documents are documents containing systematized information on the technologies, techniques and equipment used, environmental indicators and best available techniques aimed at reducing negative environmental impact and improving resource efficiency.

Importance of BAT reference documents

  • A unified methodological basis for environmental regulation
  • Identification of applicable BAT and technological indicators
  • Support for the modernization and sustainable development of industrial enterprises

Stages of developing a BAT reference document

1

Industry analysis

Study of technological processes, data collection and analysis, CTA results

2

Comparative analysis

Analysis of international reference documents (EU, OECD, RF, etc.) and adaptation to the conditions of Kazakhstan

3

Expert engagement

Discussion with enterprises, industry associations, scientific and expert organizations

4

Drafting

Preparation of the draft BAT reference document

5

Approval and support

Review by the authorized bodies until approval

6

Updating

Improvement in line with technological progress and the requirements of environmental legislation

Results of the work

24

BAT reference documents developed in 2021–2026

  • Coverage of the main industries
  • Use of international experience (EU, OECD, RF)
  • Involvement of industry experts
  • Up-to-date and applicable information for enterprises
  • Support for the introduction of modern technologies

In 2021–2026, 24 BAT reference documents were developed for enterprises:

12
Mining and metallurgical industry
2
Chemical industry
3
Oil and gas industry
2
Energy industry
1
Monitoring systems
1
Wastewater treatment for centralized sewerage systems in populated areas
3
Waste management industry

Reference documents contribute to

  • Reducing negative environmental impact
  • Improving the resource efficiency of production
  • Introducing best available techniques
  • Developing the national IEP system

Works carried out

Production of inorganic chemicals

Cement and lime production

Zinc and cadmium production

Oil and gas processing

Copper and precious metal — gold production

Combustion of fuels in large plants for energy production

Energy efficiency in carrying out economic and (or) other activities

Mining and concentration of non-ferrous metal ores (including precious metals)

Mining and processing of iron ores (including other ferrous ores)

Ferroalloys production

Iron and steel production

Production of further processed ferrous metal products

Coal mining and preparation

Treatment of wastewater from centralized sewerage systems in populated areas

Monitoring emissions of pollutants into the atmosphere and water bodies

Destruction and disposal of waste by thermal methods

Aluminium production

Plan

BAT reference documents under development in 2026

  • “Intensive rearing of pigs and poultry”;
  • “Production of low-alcohol and non-alcoholic beverages”;
  • “Production of edible vegetable oils”;
  • “Mining and processing of uranium ores”;
  • “Production of rare non-ferrous metals”.

BAT reference documents planned for development in 2027

  • “Production of milk and dairy products”;
  • “Production of milling products”;
  • “Slaughter of animals at meat-packing plants and refrigerated slaughterhouses”.

Advisory services for issuing an expert opinion on the compliance of planned technical solutions with the principles of transition to BAT

Expert opinion on the compliance of planned technical solutions with the principles of transition to BAT

Professional expert assessment of technical solutions for planned and/or under-construction industrial facilities, taking into account modern environmental requirements

Professional expert assessment of planned technical solutions for industrial facilities for compliance with the principles of transition to best available techniques.

Technical solutions adopted at the design and construction stage of a production facility largely determine its environmental characteristics, resource efficiency and the possibilities for further modernization / reconstruction.

Timely analysis makes it possible to identify potential environmental risks, assess the applicability of modern technological approaches and obtain professional recommendations for further development of the project.

An expert opinion of the BAT Bureau is an opportunity to assess technical solutions in terms of environmental requirements and the principles of best available techniques before the project moves on to the next stages of implementation.

As part of the service, specialized industry experts and specialists of the BAT Bureau analyze the materials submitted and review the key characteristics of the planned or under-construction facility. The service is aimed at assessing the environmental aspects of design solutions, analyzing technological indicators and identifying areas for improving production at the planning or construction stage.

How does it work?

1

Your technical solutions

You provide information about the planned and/or under-construction industrial facility and its technical solutions

2

Expert analysis

Our specialists review the materials submitted and analyze technological processes, emissions, energy efficiency and resource consumption indicators

3

Comparison with BAT

We compare technical solutions with national and international BAT reference documents, including the standards of EU and OECD countries

4

Expert opinion

You receive the analysis results and recommendations for improving the technical solutions

A basis for making effective design decisions

What do we analyze?

  • Technological processes

    Features of the applied and planned technological solutions

  • Pollutant emissions

    Emission levels and potential sources of environmental pollution

  • Energy efficiency

    Indicators and opportunities for improving energy efficiency

  • Resource consumption

    Use of resources and areas for optimization

  • Comparison with BAT

    Analysis based on Kazakhstani and international BAT reference documents

  • Expert recommendations

    Proposals for improving technological and management solutions

Following the service, the customer receives an expert opinion containing the results of the analysis of the technical solutions submitted and substantiated recommendations for the planned industrial facility.

The practical value of the opinion lies in the opportunity to:

  • Identify potential risks and determine issues requiring additional attention from an environmental and technological point of view.
  • Assess the validity of technical solutions – compare the approaches envisaged by the project with the applicable indicators and provisions of BAT reference documents.
  • Determine areas for improvement – recommendations for possible optimization of technological processes.
  • Use the analysis results in further planning and technical decision-making.
  • Support the enterprise’s environmental strategy – take environmental aspects and BAT principles into account when planning production development.

The expert opinion may be of interest to:

  • Industrial enterprises when planning the construction of new facilities, or the modernization or improvement of production processes.
  • Investors and project initiators – in the preliminary assessment of the environmental aspects of planned technical solutions, when considering technological alternatives and looking for opportunities to improve production; when developing technical solutions taking into account environmental requirements and modern technological approaches.

What result does the customer get?

  • Expert opinion
  • Identified risks
  • Assessment of compliance with BAT
  • Recommendations for improving technical solutions

Who will benefit from the service?

  • Industrial enterprises
  • Investors and project initiators
  • Environmental departments of enterprises
  • Design and engineering organizations

Why contact us?

  • Identify environmental risks at an early stage
  • Assess the compliance of technical solutions with BAT principles
  • Get recommendations for improving technological and management solutions
  • Improve the quality of project development
  • Take environmental aspects and BAT principles into account

A timely expert assessment helps identify issues requiring attention and develop a more informed approach to the environmental and technological aspects of implementing production projects.

For further advice, please send an official request to the BAT Bureau using the contacts below:

Kairat Massenov

Managing Director – Head of the BAT Bureau

8 7172 573 221

k.massenov@igtipc.org

Alisher Baimukhametov

Head of the BAT Reference Documents Department

8 7172 573 219

a.baimukhametov@igtipc.org

Temirbek Almagzhanov

Project Manager, BAT Reference Documents Department

8 7172 573 041

t.almagzhanov@igtipc.org

Office Manager

BAT Bureau

8 7172 573 200

info@igtipc.org

Best Available Techniques (BAT) Bureau

Monitoring, Analytics and IEP Department

Monitoring of BAT implementation and advisory and analytical support on integrated environmental permits

The Monitoring, Analytics and IEP Department is a structural division of the BAT Bureau focused on monitoring and analyzing the degree of BAT implementation, and on assisting industrial enterprises in obtaining an IEP.

Main areas of activity

1

Monitoring of BAT implementation

Collection and analysis of information on the use of best available techniques and the progress of environmental modernization of enterprises.

2

Analytical activity

Study of the state of the transition of industry to BAT, analysis of emerging issues and identification of areas for improving the BAT and IEP system.

3

Advisory support on IEP

Providing enterprises with explanations and recommendations on preparing to obtain an IEP, applying BAT and developing the necessary materials.

4

Methodological support

Explaining the provisions of BAT reference documents and the requirements of environmental legislation regarding IEP, preparing analytical materials and proposals for improving regulation.

Integrated environmental permit and the application of BAT

An integrated environmental permit (IEP) is an environmental regulation tool in the Republic of Kazakhstan aimed at reducing the negative environmental impact of industrial facilities through the application of best available techniques (BAT).

The IEP sets environmental conditions for carrying out activities, including technological standards, emission standards, and requirements for waste management and industrial environmental control.

Which facilities is an IEP required for?

In accordance with the Environmental Code of the Republic of Kazakhstan, an IEP is mandatory for Category I facilities, subject to the transitional provisions established by law.

For facilities of other categories, the possibility of obtaining an IEP is determined in accordance with the requirements of environmental legislation.

The relationship between the IEP and best available techniques

The IEP system is based on the application of BAT – effective technical and technological solutions aimed at reducing negative environmental impact and improving the resource efficiency of production.

1

BAT reference documents

Contain information on applicable BAT and technological indicators

2

Application of BAT

Introduction of modern technologies to reduce negative environmental impact

3

IEP

Setting environmental conditions for the facility’s operation, taking BAT into account

When determining the applicable BAT, BAT reference documents containing information on production processes, techniques used and environmental indicators are used. In accordance with the law, national and international BAT reference documents may be taken into account.

The application of BAT helps reduce emissions and discharges of pollutants, cut waste generation, use resources rationally and modernize enterprises technologically.

Main requirements for obtaining an IEP

An IEP is obtained in accordance with the Environmental Code of the Republic of Kazakhstan and the rules for issuing environmental permits.

Depending on the characteristics of the facility, the required materials include a justification of technological standards, information on the techniques used, emission standards, an industrial environmental control program and other documents provided for by law.

For existing facilities that do not comply with BAT technological indicators, the law provides for the development of an environmental efficiency improvement program.

The IEP is issued by the authorized state body in the field of environmental protection.

The role of the Best Available Techniques Bureau

The BAT Bureau of International Green Technologies and Investment Projects Center NJSC provides scientific, analytical and methodological support for the introduction of BAT in the Republic of Kazakhstan.

The Bureau’s activities include developing BAT reference documents, analyzing production processes and studying international experience in environmental regulation, contributing to the development of the national BAT system and the formation of a technological basis for the transition to IEP.

For further advice on the transition to IEP, please send an official request to the BAT Bureau using the contacts below:

Kairat Massenov

Managing Director – Head of the BAT Bureau

8 7172 573 221

k.massenov@igtipc.org

Abylaikhan Talgatov

Head of the Monitoring, Analytics and IEP Department

Call

a.talgatov@igtipc.org

Gulnazym Akhmetova

Project Manager, Monitoring, Analytics and IEP Department

8 7172 573 212

g.akhmetova@igtipc.org

Office Manager

BAT Bureau

8 7172 573 200

info@igtipc.org